Here the principal training objectives are IEC 61131-3 programming, addressing of axes from the PLC, and communications options under TwinCAT. The training is aimed at PLC programmers who are transferring to the TwinCAT system, but who are familiar with high-level language concepts such as declaration of variables, variable classes and structures.
Requirements | Experience of the following is expected:
| Ordering information | TwinCAT Training: Compact programming |
|---|---|
| TR1000 | – TwinCAT PLC: TwinCAT handling, IEC 61131-3 programming |
– TwinCAT NC PTP: basis of axis commissioning |
|
– TwinCAT ADS: the communication interface to TwinCAT devices |
|
| duration: 5 days |